Saturday, April 1, 2023

12-02-2020 Planning Board Documents

Master Plan – 4-Lot, 7-Unit Major Land Development Project – Fairview Estates – AP 18, Lot 7K, 66 Fairview Avenue. Shoreline Properties, Inc., applicant.

–  Master Plan – Fairview Estates – Sheet 1 – Cover Sheet – 11-6-20

–  Master Plan – Fairview Estates – Sheet 2 – Existing Conditions Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 3 – Conventional Development Yield Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 4 – Proposed Cluster Development Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 5 – Proposed Conditions Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 6 – Proposed Grading Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 7 – Proposed Grading Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 8 – Proposed Road Profile Plan – 11-6-20

–  Master Plan – Fairview Estates – Sheet 9 – Drainage and Erosion Control Details – 11-6-20

–  Master Plan – Fairview Estates – Sheet 10 – Drainage Details – 11-6-20

– Master Plan – Fairview Estates – Sheet 11 – General Notes and Details – 11-6-20

– Fairview Estates – Project Narrative – 11-6-20

– Fairview Estates Duplex Design

– Crossman Engineering – Master Plan Review Memo – Fairview Estates – 11-21-20

– Hopkinton Conservation Commission Letter to Planning Board – Fairview Estates – 11-19-20

– Hopkinton Inclusionary Zoning Ordinance

– Fairview Estates Landscape Plan


Development Plan Review – Photovoltaic Solar Energy System – 40 Maxson Hill Road – AP 4, Lot 38, 40 Maxson Hill Road. Centrica Business Solutions, applicant.

– 40 Maxson Hill Road Solar – DPR Plan Set – Revised 11-20-20 STAMPED

– 40 Maxson Hill Road Solar – DPR Presentation – 11-19-20

– 40 Maxson Hill Road Solar – Letter from Attorney Surdut to the Planning Department

– Couture Letter to Planning Board

– 40 Maxson Hill Road Solar – Decommissioning Estimate – Centrica – 11-17-20

– 40 Maxson Hill Road Solar – DRAFT Soil Erosion and Sediment Control Plan – 5-11-20

– 40 Maxson Hill Road Solar – RIPDES Permit – 10-27-20

–  40 Maxson Hill Road Solar – Drainage Report – 5-11-20 STAMPED

–  40 Maxson Hill Road Solar – Noise Impact Assessment – 8-18-20

–  40 Maxson Hill Road Solar – Operation and Maintenance Plan – Revised 11-17-20

–  40 Maxson Hill Road Solar Affidavit Rev 11-13-20

–  ESS Response to Crossman Engineering Peer Review – 11-19-20

–  Crossman Engineering – 40 Maxson Hill Road Solar – DPR Memo – 11-21-20

–  DPI and TerraInk Certification


Pre-Application Meeting – Comprehensive Permit – Brushy Brook – Plat 31, Lots 1 through 71, Dye Hill Road. LR 6-A, LLC., applicant.

– Brushy Brook – Layout Alternatives – DiPrete Letter, dated 11-19-20

– Brushy Brook – Concept Plan – Option A, drawn 8-17-20

– Brushy Brook – Concept Plan – Option B, drawn 8-17-20

– Brushy Brook – Concept Plan – Option C, drawn 8-17-20

– Brushy Brook – Concept Plan – Option D, drawn 8-17-20

Brushy Brook Decision – 11-23-2010

Letter to Planning Department and Board from Carol Desrosiers – 11-19-20